
Section 5 - OPERATIONAL EQUIPMENT
HEATING AND VENTILATING
a. Heating of the cockpit is obtained by operation of the
control marked "Cabin Heat". (See fig. 1-11).
b. Ventilating is accomplished by opening a small air
scoop on the upper left of the fuselage just forward
of the canopy. The scoop is operated by means of a con-
trol lever. (See fig. 1-18.)
OXYGEN SYSTEM
a. This is a standard low pressure oxygen system with a
diluter demand oxygen pressure breathing regulator,
Type A-14.
b. Normal oxygen pressure (fig. 2-13) is 400 to 450 lb/sq in.
ARMAMENT
A. Not applicable.
COMMUNICATIONS EQUIPMENT
a. The airplane has a standard installation of an SCR-522
transmitter and receiver with a BC-602A control box.
Comentários a estes Manuais