Commissioning
Checking Phase Current
Input Connections
For Differential Applications
Description
Perform this check to test differential applications
(machine, transformer or transformer-machine unit).
This test is carried out along with checking phase
current and phase voltage input wiring. The purpose is
to check the wiring of the second Sepam™ current
input.
Block Diagram
DE50710
DE50359
If the secondary circuits of the CTs do not
have the same ratings (1 and 5A or 5 and
1A) as the Sepam™ current inputs they are
connected to, set the injection value to the
lowest secondary rating. The value indicated for the
phase currents (Ia, Ib, Ic) or (I’a, I’b, I’c), is then equal
to the CT rated primary current divided by 5 (I
N/5).
Procedure
1 Connect the generator current terminals to the corresponding current test terminal
boxes according to the block diagram. Use the plugs provided.
2 Turn the generator on.
3 Adjust the generator current output, I, to match the CT rated secondary current (1A
or 5A).
4 Inject the generator output (as shown) into the phase 1 current input terminals of
each Sepam™ connector , and , connected in opposition (via the test
boxes, according to the diagram above).
5 Use the SFT2841 software to check the following:
b the value indicated for phase current Ia is approximately equal to the rated
primary current of the CT (In) wired to the Sepam™ connector
b the value indicated for phase current I’a is approximately equal to the rated
primary current of the CT (I’n) wired to the Sepam™ connector
b the value indicated for phase displacement θ(I, I’) between currents Ia and I’a is
equal to 0°
6 Check the Ib and I’b, Ic and I’c, and θ(I, I’) values as well the values between Ib-I’b
and Ic-I’c after transferring the injection plugs to the phase b current and then phase
c current input terminals of each of the Sepam™ connectors.
7 Turn the generator off.
a
B1
B2
B1
B2